The hydroelectric plant Noiariis geodetic uses the jump between the discharge of the hydropower plant Museis and resort Noiariis. The plant and the towns of Cercivento Sutrio. It is designed to use the exhaust flow from the hydroelectric power Museis: the waters are collected from the outlet of this plant and, after having returned a part of the stream, they are placed in the tub and then load in the penstock.
the power plant are installed two turbine-generator groups of different sizes with a total power of 2450 kW . The new hydroelectric Noiariis is provided with fully automatic operation. The generation units are started and schemes according to a criterion di precedenza programmabile sulla base delle portate derivabili ed in conformità alle segnalazioni fornite dal misuratore di livello in vasca di carico. La producibilità annua ottenibile dall'impianto idroelettrico di Noiariis può raggiungere i 9.800.000 kWh .